XI. Ответьте на общие вопросы в соответствии с содержанием текста.
1. Is the underground railway the quickest means of transport?
2. Can Metro solve the problem of carrying a great number of passengers in large cities?
3. Does the underground railway system include only subsurface lines?
4. Are the sleepers of the underground railway laid on concrete base?
5. Do the Metro trains always consist of 4 coaches?
6. Are there underground railways in 80 cities all over the world?
7. Was London the second city to build the Metro?
8. Did New York construct its Underground in 1963?
9. Do you know where the shortest railway line in the world is?
10. Have metro lines been already constructed in all large cities all over the world?
ВАРИАНТ 5
I. Перепишите и переведите предложения, обращая внимание на употребление времён группы Continuous (Present, Past, Future) и группы Perfect (Present, Past, Future) в действительном и страдательном залогах. Выпишите сказуемые и укажите их видовременные формы.
1. According to schedule, this train was due to arrive at 12.30, but because of track repair work, it is being delayed. 2. The passengers had been invited to get on the train and now they were exchanging farewells with those who had come to see them off. 3. China is planning to construct several thousand kilometers of high-speed lines for the transportation of 1,5 billion passengers and 2,1 billion tones of freight a year. Specific plans have been drawn up to upgrade the busiest main lines for semi-express train running at 160 km/h or express trains moving at 250 km/h. At the same time the possibility of the train speed increase up to 350 km/h is being investigated.
II. Перепишите и переведите предложения, поставив глагол в нужную форму.
1. She (to tell – Past Indefinite Passive) in the enquiry office that the schedule of this commuter train (to change – Past Perfect Passive). 2. Several newspapers (to report – Present Perfect Active) that the Russian and Finnish governments (to discuss – Present Continuous Active) a project for the reconstruction of the Helsinki-St. Petersburg railroad known in Finland as the Eastern Railway. 3. The new three wagon Tank Train (to test – Present Perfect Passive) in severe winter conditions on the Alaska Railroad. 4. The construction of both the bridge and the dam (to complete – Future Perfect Passive) by the beginning of the navigation season. 5. At present 2,500 km of high-speed lines (to construct – Present Continuous Passive) in Europe and Asia.