References

11] Y. Ruan, Q. Liu, W. Zhou, B. Batty, W. Gao, J. Ren, T. Watanabe, A procedure to design the mainline system in natural gas networks, Appl. Math. Model. 33 (2009) 3040-3051.

[2] A. Kabiriana, M.R. Hemmati, A strategic planning model for natural gas transmission

networks. Energy Pol. 35 (2007) 5656-5670. 13] A. Cheboubaa, F. Yalaoui, A. Smati, L. Amodeoa, K. Younsi, A. Tairi, Optimization of natural gas pipeline transportation using ant colony optimization. Comput. Oper. Res. 36 (2009) 1916-1923.

[4] M. Hamedi, R.Z. Farahani, M. Moattar Husseini, G.R. Esmaeilian, A distribution plan­ning model for natural gas supply chain: a case study, Energy Pol. 37 (2009) 799-812. I5] A. Herran-Gonzalez, J.M. De La Cruz, B. Dc Andres-Toro, J.L. Risco-Martin, Modeling and simulation of a gas distribution pipeline network. Appl. Math. Model. 33 (2009) 1584-1600.

A. Martin, M. Moller, S. Moritz, Mixed integer models for the stationary case of gas network optimization. Math. Program. 105 (2006) 563-582. I R.Z. Rios-Mercado, S. Kim, E.A. Boyd, Efficient operation of natural gas transmission systems: a network-based heuristic for cyclic structures, Comput. Oper. Res (2006)

2323—2351.

I P.J. Wong, R.E. Larson, Optimization of tree structured natural gas transmission networks, J. Math. Anal. Appl. 24(3) (1968) 613-626.

[9] S. Wu, R.Z. Rios-Mcrcado. E.A. Byod. L.R. Scott, Model relaxation for the fue| Cost minimization of steady state gas pipeline networks, Math. Comput. Model. 31(2-ъ (2000) 197-220.

[10J Critical Infrastructure Assurance Office, Tab В Preliminary Research and Development Roadmap for Protecting and Assuring the Energy Infrastructure. Preliminary Research and Development Roadmap for Protecting and Assuring Critical National Infrastructures (Transition Office of the President's Commission on Criticil Infrastructure Protection and the Critical Infrastructure Assurance Office, Washington

DC), 1998. Available from: http://www.oe.energy.gov/DocumentsandMediti/ Prcliminary_RandD_Roadmap_for_Prot_and_Assur_Critical_Natl_Infr.pdf (accessed April 2010).

[11] National Petroleum Council, Securing oil and natural gas infrastructures in the new economy. A report by the National Petroleum Council: Committee on Critical Infrastructure Protection, 2001.

112] International Energy Agency. Security of gas supply in open markets. International Energy Agency (IEA), 2004.

113] C. Pellctier, J.C. Wortmann, A risk analysis for gas transport network planning expan­sion under regulatory uncertainty in Western Europe. Energy Pol. 37 (2009) 721—732.

[14] C. Jepma. Gaslcvering onder druk. Stichting JIN. Available from: www.jiqweb.org, 2001 (52pp.) (in Dutch).

[15] C. Jepma, M. Broekhof. W. van der Gaast. Hydra. Aantasting van leveringszekerhcid stichting JIN, 2004 (106pp.) (in Dutch).

[16] C. Unsihuay-Vila, J.W. Marangon-Lima, A.C. Zambroni dc Souza, I.J. Perez-Arriaga, P.P. Balestrassi, A model to long-term, multiarea, multistage, and integrated expansion planning of electricity and natural gas systems, IEEE Trans. Power Syst. 25(2) (2010) 1154-1168.

117] J.R.G. Whiteford. G.P. Harrison, J.W. Bialek, Electricity and gas interaction: a UK per­spective and risk assessment. IEEE. 2009, 978-1-4244-4241-6/09.

[18] M. Arnold. R.R. Negenborn. G. Andersson, B.D. Schutter, Model-based predictive con­trol applied to multi-carrier energy systems. IEEE, 2009. 978-1-4244-4241-6/09.

[19] J. Munoz, N. Jimcnez-Rcdondo, J. Perez-Rc, J. Barquin Natural gas network modeling for power systems reliability studies. 2003 IEEE Bologna PowerTech Conference, June 23-26, 2003, Bologna, Italy.

[20] Fedora P.A.. Reliability review of North American gas/electric system interdependency. in: Proceedings of the 37th Hawaii International Conference on System Sciences, 2004.

[21 ] D.W. Hubbard. The Failure of Risk Management: Why It's Broken and How to Fix It, John Wiley & Sons. Hoboken, NJ, 2009.

[22] O.S. Vaidya, S. Kumar. Analytic hierarchy process: an overview of applications. Eur. J. Oper. Res. 169(1) (2006) 1-29.

[23] The Institute of Risk Management. A risk management standard. The Institute of Risk Management. 2002. Available from: www.thcirm.org.

[24] J. Dunjo, V. Fthenakis, J.A. Vilchea. J. Arnaldos, Hazard and operability (HAZOP) analysis: a literature review. J. Hazard. Mater. 173(1-3) (2010) 19-32.

[25] V. Preston. Questionnaire survey. Int. Encycl. Hum. Geog. (2009) 46—52.

[26] S. Reinach, A. Viale, Application of a human error framework to conduct train accident/incident investigations. Accident Anal. Prevent. 38(2) (2006) 396—406.

[27] C. Lee. M. Su Fault-tree analysis of intuitionistic fuzzy sets for liquefied natural gas terminal emergency shut-down system. IIH-MSP, vol. 2, pp. 574—577, Thir

International Confcrcnce on International Information Hiding and Multimedia Signal Processing (IIH-MSP), 2007.

[28J E. Cagno. F. Caron, M. Mancini, F. Ruggeri, Using AHP in determining the prior dis­tributions on gas pipeline failures in a robust Bayesian approach. Reliability Eng. Sys. Safety 67 (2000) 275-284.

[29] J. Krueger, D. Smith, A practical approach to fire hazard analysis for offshore struc­tures, J. Hazard. Mater. 104 (2003) 107-122.

[30J P.L. Metropolo. A.E.P. Brown, Natural gas pipeline accident consequence analysis, in: 3rd International Conference on Computer Simulation in Risk Analysis & Hazard Mitigation. Sintra, Portugal, 2004, pp. 307-310.

[31] Y. Jo, B.J. Ahn, A method of quantitative risk assessment for transmission pipeline car­rying natural gas, J. Hazard. Mater. A123 (2005) 1-12.

[32] S. Sklavounos, F. Rigas, Estimation of safety distances in the vicinity of fuel gas pipe­lines, J. Loss Prevent. Process Ind. 19 (2006) 24-31.

[33] Y.D. Jo, D.A. Crowl, Individual risk analysis of high-pressure natural gas pipelines, J. Loss Prevent. Process Ind. 21 (2008) 589-595.

[34] A.J. Brito, A.J. de. Almeida, Multi-attribute risk assessment for risk ranking of natural gas pipelines. Reliability Eng. Sys. Safety J. 94(2) (2009) 187-198.

[35] J.A. Suardin. A.J. McPhate, A. Sipkema, Fire and explosion assessment on oil and gas floating production storage offloading (FPSO): an effective screening and comparison tool. Process Safety Environ. Protect. 87 (2009) 147-160.

[36] A.J. Brito, A.J. de Almeida, C.M.M. Mota, A multicriteria model for risk sorting of nat­ural gas pipelines based on ELECTRE TRI integrating utility theory. Eur. J. Oper. Res. 200 (2010) 812-821.

[37] Z.Y. Han, W.G. Weng, An integrated quantitative risk analysis method for natural gas pipeline network, J. Loss Prevent. Process Ind. 23(3) (2010) 428-436.

[38] TNO Purple Book. Guidelines for quantitative risk assessment. CPR18E. first ed.. Committee for the Prevention of Disasters, The Netherlands, 1999.

[39] G. Shi, Y. Jing, X. Zhang. G. Zheng Prospects of natural gas storage and transportation using hydrate technology in China, IEEE, 2009. 978-1-4244-2800-7/09.